Hi All

 

While running a data package from an excel input schedule, it takes about 8 mins to execute the package. If I were to limit the package for the specific entity, project, and customer dimension, the package should get executed in lesser time, thus meeting the need of the end user inputting data on the package.

 

Is there a way to call the POV from the Excel input schedule while executing the package so as to reduce the wait time for the end user?

 