Quantcast
Channel: SCN : Discussion List - SAP Planning and Consolidation, version for SAP NetWeaver
Viewing all articles
Browse latest Browse all 5414

Cannot restore Environment via UJBR in different system

$
0
0

Hi Experts

 

I am running BPC 10

BW: 7.3

BPC Patch:

 

I am hoping someone can point me in the right directly...

 

We need to replace the entire environment in DEV with what we have in PROD in order to standardise technical names and get DEV up to date.

 

I first took a backup of the environment in PROD using UJBR.  Before this, I checked to ensure I only had 'Information' or 'Warnings' in UJA_DATA_CHECKER.  All dimensions were processed and green.

 

I then deleting the environment in DEV, conscious of the fact that I need to remove all trace to it.  I did this via UJS_ACTIVATE_CONTENT.  I then checked UJT_CHECK_TABLE_ENTRIES to make sure there were no table entries.  There wasn't....  I also checked in RSA1 and there was no sign of the elements relating to the deleted environment

 

I ran UJBR restore (including Technical Names) and it failed after a few minutes with the message:

 

Error occured while creating dimension ANALYSIS via Admin API

 

I then thought I would try restoring the environment to a different name (just to check if there was a problem with what I thought I had deleted).  This time, I received:

 

Restoring environment DEV_WED with original technical name not possible

 

If I try doing this restore without the technical names, it works fine.

 

Any suggestions ?  I am pulling my hair!

 

Ian


Viewing all articles
Browse latest Browse all 5414

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>