Hi
My work status setup includes Entity, Audi trail, Time and Version.
I changed the status from "None" to "Submitted" at the "Total Audit trail" level and Q2.2013 and checked Include all Decedents
but the status of "Total Audit trail" and Q2.2013 is still none even though all the base members have changed to Submitted.
The only parent IDs I see in the work status report is for Entity.
Thanks