Using excel formula in epmformattingsheet

$
0
0

Hi all,

 

I've been using the method in link below to populate a column in my report - by entering the formula in the formatting sheet for a specific member.

 

How to use Excel formulas in BPC Input Schedules

 

However, when the value in the cells change based on the formula, EPM doesn't seem to recognize the change to the member values. It keeps saying there is no data to save even if the values have been modified.

 

The report is setup as an input report - doesn't inherit sheet options and the members are not set as read-only members. The members are base level too.

 

Could anyone help?

 

Thanks

Mala