Hi,
I know that in versions pre V10 in BPC you could set up members for the other dimensions then the ones in the work status (ENTITY, TIME, CATEGORY) in our case. For instance I still want to be able to run an FX translation data manager package even when an entity is in a submitted / approved state. This should not reset the control status as no LC data has been changed. Work status settings should be as following. Our interfaces from ECC-FI come in via a data manager package as well and when an entity is in a Locked state, they should give an error as they ARE changing LC data.
What I'm trying to achieve is that when all LC data has been run throught the controls, uses should still be able to run some data manager packages like FX Translation, Generate Intercompany Matching Data and Genarate Cash Flow data. All of these packages take data out of LC and post into some other Currency, Catergory or AuditID.
Is there any way to achieve this in BPC10?