Dear ALL,
I'm working on SAP BPC 10.0 NW version.
So, I'm launching a script logic for a particular company, actually working on the currency translation but unfortunately I got an error "Error checking work status".
I did enable the Work Status in my model, and I did also put 2 Controls in it. But, I'm very sure the 2 Controls are all pass which I could also see the same from Control Monitor.
Any part which I could have missed out or any steps I have to work on in order to skip the error?
BR,
Antony