Hi Gurus
When loading the base year, I need to block all data are loaded and are part of the input Schedle.
But this is variable, for example, if I am in August and Julio by real data, these should be blocked (January-July), but if I decide to change the month after cutting in September, I need to block from January to August.
I tried blocking the report, but that leaves fixed a period of time and need to apply mobility according to charging period.
Anyone know how to do it?
Greetings and thank you very much
Carolina