bpf activity levels control via enh spot 7.5

$
0
0

Hello Experts,

 

I have a req in bpc 7.5 NW version with respect to bpf execution.

 

I would like to know whether using any BADI Enhancement sport we can control levels creating in bpf

 

If there are 3 levels e.g. Costcenter (2)--> Projects(5) --> WBS Elements (200)

 

If I want to create a bpf activity at Project level so that we have only 5 activities in the list (I do not want to create 200 activities in the list).  I think this can be handled in BOPC 10 but I want to find if there is a way to handle in version 7.5

 

Hope I am clear with what I need. Please help.

 

Kind Regards

Krishna

from the below screen shot as of now system allows only to select SELF, BAS and DEP while executing the BPF. Here we need more flexibility of selecting more than one value (just not limited to self, base or dep)

Are there any BADI's etc.to achieve this functionality in BPC 7.5.

 

We have this flexibility in BOPC 10.0 I believe.

 

Untitled.png

 

Message was edited by: Krishna Bodapati