Hi,
I'm trying to make a button to Drill Through in BPC 10.0 NW, in order to push a button in the worksheet instead of going through the EPM Pane and push the "Drill Through" from there. It has to be dynamically in order to the selected cell in the sheet.
I have seen that it is possible to use the function DrillThroughToURLFromRange, but I don't know how to use it.
Has anyone tried this?
I'm not interested in using a concatenated hyperlink in VBA.
Thanks in advance.
Best regards,
Anders