Hi,
We are on SAP BPC NW10,SP10.
Last week we faced a data loss issue in production system.How ever we could recover as we had backups for the data.
Now analyzing the root cause for the data loss.During the suspected period there were no "Clear" or "Copy" jobs.
Checked the logs for these process chains in BW back end and in UJFS as well.There are no exact logs in SM37 also.
So we are assuming that data was not cleared with (Clear and Copy)DMPs.
Only possibility I am assuming is some users might have cleared the data with input forms accidentally.
But this is huge data(around 25,000 entries)which is not accepted by the management.
Is there any other possibility for data loss?
Can we clear the data on higher nodes in input forms?
(I mean if we select top node Organization and top node Term,any functionality or Macro can clear the data for base members?)
Thanks for anticipated help,
Manohar
NB:Audit logs are not turned on as they are consuming lot of space.