Hi gurues!
I started to work in sap bpc 7.5 recently.
The client has an issue.
Last year, in the budget load, when they collected the input schedules that had been distributed, the system only loaded the cells that had been modified. So, the cells that had not been modified, weren' t loaded. This wasn't correct. They wanted all the cells to be loaded.
I know that this is the standard behavior of the system, but this year, their requirement is that the input schedule loads all data. This should include the modified cells and those that are not modified.
Thanks in advance!
Regards,
LUCAS