Hello,
I have a doubt at SAP BPC 10.0 level.
If there are changes made at ECC level for eg. cost center addition, material code, etc , do we have to make any changes again at SAP BPC 10.0 level.
Thanks,
Gaurav
Hello,
I have a doubt at SAP BPC 10.0 level.
If there are changes made at ECC level for eg. cost center addition, material code, etc , do we have to make any changes again at SAP BPC 10.0 level.
Thanks,
Gaurav