Dear All,
I need to schedule a DM package to run at a particular date/time. I believe BPC Excel addin provides that, but it gets scheduled at the client machine. If I need to schedule it to run the server[BPC 10.0 NW on Oracle], how can I do that?
Thanks for the help in advance!
Regards,
Peri