Hello Every one,
I am currently using CPMBPC 801 SP08 EPM Add-in SP22, BW 740,SP09
Facing a small issue while changing the work status.
we have two controllers OR controller and another is CC
Here OR is owner and CC is manager
we gave a access like OR can change the work status on base level, and CC on Parent level not on base level.Now the problem is we CC controller set work status on Parent level and selection Member and Descendants and Submitted, Now the work status is set to submitted for base level and its reflection in the report correctly but the on parent member is still open..?
Even though we submitted its always showing as submitted.
Looking forward for your help ..
Thank you very much