Hi BPC experts,
We are working in a project in SAP BPC 10 NW.
We have two models that have all the same dimensions except one. We have developed the reports in one model and we would like to copy them in the other model and adjust them so they work properly.
In previous versions of SAP BPC it was possible to do this quite easily: copy the reports, go to the EVDRE section, change the name of the model and the name of the dimension and it worked properly after a few adjustments. Is it possible to do something similar in version 10?
Best regards and thanks in advance